Brookhaven 2030
  • Home
    • What is Brookhaven 2030?
    • Phase 1 Overview
      • Benefits
      • Timeline & Schedule
    • Big Picture
    • Roles & Responsibilities
  • Scope
    • Phase 1
      • Trends and Conditions
      • Environmental, Cultural and Open Space (ECOS)
      • Community Development
      • Draft Plan
    • Phase 2
  • Project Library
    • Brookhaven 2030 Video
  • News & Events
  • Participate
    • Workshops
    • Surveys
    • Contact Us
  • Links
Plan 2030 News
View the Presentations
from the Charrette
View the Existing Conditions
and Trends Report
Read the
Planning Primer
View the Draft GEIS
Scoping Document
Participate in the Online
Visual Preference Survey
View the ECOS
Workshop Results
More Past Planning Studies
Have Been Uploaded
View the Brookopoly
Ballot Results
Issues and Opportunities
Report now available
Scope  >  Phase 1  >  Draft Plan
Login  |  Register
Draft Comprehensive Plan 2030
  • Overview
  • Open Houses to Present Draft Plan
  • Plan Review
  • Deliverables
Overview
Together, the data collection, analysis, and work products developed throughout the previous steps of Phase I will provide the foundation for the final step − the development of Draft Comprehensive Plan 2030. The draft plan will be issued in September 2008.
Open Houses to Present Draft Plan
Immediately following the release of the Draft Plan, several public information meetings will be held to present the recommendations of the Draft Plan.

Following several hours of viewing, a presentation will be made to summarize the conditions, trends, vision, policies and strategies of the Plan. Questions and comments from the public will be recorded and taken into consideration.

These meetings are open to the public and invitations will be sent to key stakeholders including the members of the Citizens’ Assembly and citizens who would like to be contacted.

Plan Review
Throughout July and August, the Steering Committee will meet with the consultants to review the Plan and make recommendations for revisions, if necessary. These meetings will be open to the public, with a public comment period at the end of each meeting.
Deliverables
The following documents will be produced based on the results of the Community Development component of Phase I.
  • Draft Comprehensive Plan 2030
These documents will be available for download upon their completion.
Copyright 2011 by the Town of Brookhaven   |  Privacy Statement  |  Terms Of Use